TR    IT     ENG

ABOUT US

‘’We are building renewable future’’

    NEWS

SEARCH

WIND ENERGY POWER PLANT
The consolidated licensing process experience of wind energy parks development acquired on the field by the company founders , drove Galata Renova Energy to work a project for wi
 
Is there any power margin for setting up unlicensed electric production plant?
Unlicensed electric production plants can be set up maximum in 1MW power and can be codified maximum 1MW to the system.There is a license application condition whose renewable sourced e
 
How can energy surplus be entered in an account?
It will be different when the energy surplus’s deduction that given to the system produced in unlicensed production plants is in the same area with consumption plant (a) or is not in the same
 
Matters that you wonder about setting up unlicensed electric production plant
In production plant, natural and legal persons who have 1 MW power can set up unlicensed electric production plant.
 
Is there any guarantee of buying unlicensed electric production?
Yes, it is.The produced unlicensed electric energy’s surplus, on the basis of the price in YEK statement written in attached 1 (one) list, it has 10 years guarentee.
 
What are the bureaucratic operations for setting up unlicensed production plant?
In the case of setting up unlicensed electric production plant based upon hydraulic sources, it can be made to th
 
SOLAR ENERGY POWER PLANT
PROJECTS PHOTOVOLTAIC The first project realized by Galata Renova Energy is a plant for the production of energy through Photovoltaic techn
 
HYDRO ENERGY POWER PLANT
Hydroelectric power stations are capital intensive and long lasting investments. Licensing process are very long and need a detailed Enviroment Impact Assessment. Galata Ren
 
GEOTHERMAL ENERGY POWER PLANT
Possible sites are under investigation in Turkey and abroad.
 
BIOMASS ENERGY POWER PLANT
Biomass availability close to energy production and consumption points is a key success factors for a profitable implementation of biomass based power plants. Galata Renova energy is fo
 
To whom the produced unlicensed electric energy surplus can be sold?
Produced unlicensed electric energy surplus can be sold as long as it does not exceed installed 1 MW capacity, except any sales limit in the scope of boost mechanism, with renewable energy sources
 
COPYRIGHT © 2013 GALATA RENOVA. ALL RIGHTS RESERVED.     |     PRIVACY POLICY     |     NEWS     |     FREQUENTLY ASKED QUESTIONS